Master Plan Schedules and Optimization
1)根據(jù)銷售預(yù)測,訂單需求及庫存策略,編制自制零部件和組裝加工件的月度/季度/年度主生產(chǎn)計劃,確保產(chǎn)能與需求平衡;
Based on sales/demand forecasts, orders and inventory strategy, creat monthly/quarterly/annually master plan schedules in order to ensure production capacity and demand balance.
2) 協(xié)調(diào)生產(chǎn),采購和倉庫等團(tuán)隊,滾動調(diào)整周/月生產(chǎn)計劃,確保訂單及時交付。
Coordinate with Productiono, Purchasing and Warehouse teams to update weekly/monthly rolling build plan, so to ensure orders can be fulfilled timely.
MRP Management
1)基于主生產(chǎn)計劃,運(yùn)行MRP系統(tǒng),生成物料需求清單,確保原材料的及時供應(yīng)。
Based on MPS and run MRP function to creat a MRP list, ensure raw materials can be supplied timely.
2)與采購團(tuán)隊協(xié)同,跟蹤關(guān)鍵物料到貨情況,預(yù)警潛在缺料風(fēng)險,推動供應(yīng)商交付改善。
In collaboration with Purchasing to track key materials supply and delivery, provide backorde risks alert and facilitate suppliers delivery performance working with Purchasing.
3)協(xié)助上級優(yōu)化庫存水平,設(shè)定安全庫存參數(shù),減少呆滯物料,提高庫存周轉(zhuǎn)。
Assist superior to improve inventory level and set safety stock; reduce stock level of slow-moving materials so to improve inventory turnover.
Supply Chain Collaboration and Communication
1)作為生產(chǎn)和銷售、采購、物流等團(tuán)隊的銜接樞紐,定期召開SIOP會議。
Organize regular SIOP meetings as a key communication bridge connecting Production, Sales, Purchasing and Logistics teams.
2)與技術(shù)部/研發(fā)部合作,管理新產(chǎn)品導(dǎo)入(NPI)及工程變更(ECO)對生產(chǎn)計劃的影響。
Collaborate with Technology/R&D teams to manage NPI and ECO impact on MPS.
3)協(xié)助管理委外加工計劃,確保訂單及時交付。
Assist to manage contract manufacturing orders, ensure CMO can be fulfilled timely.
Data Analysis and Procedures Optimization
1)通過ERP/MRP系統(tǒng)監(jiān)控關(guān)鍵指標(biāo)(如OTD、庫存周轉(zhuǎn)、計劃準(zhǔn)確率),編制供應(yīng)鏈績效報告。
Creat supply chain performance reports based on KPI data downloaded from ERP systems.
2)維護(hù)ERP系統(tǒng)數(shù)據(jù)準(zhǔn)確性,確保BOM,主數(shù)據(jù)等基礎(chǔ)信息及時更新。
Maintain data accuracy in ERP, ensure BOM and MD can be updated timely.
3)協(xié)助識別計劃與物料管理流程中的瓶頸,參與數(shù)字化供應(yīng)鏈改善項目。
Assist to identify bottlenecks in planning and materials management procedures, participate digitalized supply chain projects.
任職要求:
- 本科及以上學(xué)歷,供應(yīng)鏈管理、物流管理等相關(guān)專業(yè)
Bachelors or above, supply chain or logistics related major.
- 5年以上醫(yī)療器械制造企業(yè)計劃崗位經(jīng)驗,精通MRP/ERP系統(tǒng)操作(如SAP、Oracle、金蝶)熟悉MPS/MRP邏輯及系統(tǒng)配置。5 years or above of planning experiences in medical device manufacturing industry, fully understand ERP/MRP operational logic and system configuration including SAP, Oracle or Kingdee.
- 熟悉供應(yīng)鏈計劃全流程(S&OP、MPS、庫存控制)
Familiar with all supply chain procedures such as S&OP, MPS and Inventory Management.
Fluent English skill
- 如經(jīng)過評估,證明人員確實具有豐富的和良好的履職能力,可適當(dāng)放寬相關(guān)要求。
Job requriements can be adjusted if candidates’capablities and experiences qualifications are proved after evaluation